Washington: Stilly River Bridge Work Will Disrupt I-5 Traffic for Months

I-5 Exit Guide | WashingtonARLINGTON — Bridge work on I-5 over the Stillaguamish River will result in a major traffic disruption this summer. The state Department of Transportation is replacing the concrete deck and part of the steel support frame of the bridge span that carries southbound traffic across the river.

read the full story…